The best extension builders in the UK, city by city

An extension adds room to a home you already like instead of moving. It might be a bigger kitchen at the back, a new bedroom in the loft or a garage turned into a living space. The work involves foundations, structure, roofing, services and finishing, so the builder you choose matters a great deal. Our rankings compare extension builders in each city using Google ratings weighed against review counts, plus checks on a visible email address and Companies House status.

  1. 108found
  2. 47qualified
  3. 30ranked
  4. 4cities

Compare

Who comes top for extension builders in each city

Each city has its own list of extension builders, made only from firms that work there. Pick a city to see the full ranking and ask for quotes. Right now the highest score belongs to Bratt Builders & Roofing Specialists in Birmingham.

CityNumber oneTop Local scoreAverage starsFoundRanked
LondonMy Extension PM4.674.972710
ManchesterKG Construction4.574.86275
BirminghamBratt Builders & Roofing Specialists4.694.832710
LeedsVision Loft Conversions4.574.86275

Scores are out of five. ‘Found’ is how many firms we reviewed in each city before any checks.

Prices

What decides how much a house extension costs?

No official body publishes extension prices, so treat online cost guides as rough guides from private sites. Your own figure depends on the size, the number of storeys, the ground conditions, the structure and the finish. A simple single storey box with a flat roof and standard windows is at one end. A two storey addition with large glazing, steel beams and a new kitchen is at the other.

Some of the biggest costs are hidden below ground. Poor soil, nearby trees or a public sewer under the garden can mean deeper or special foundations, and work near a shared sewer may need the water company's agreement. Moving drains, gas and electrics also adds up.

Then there are the costs outside the builder's quote. Drawings, structural calculations, planning and building control fees, party wall surveyors and new furniture all belong in your budget. Many people also set aside a contingency for problems found once work starts. As for the cheapest way to extend, it usually means a simple shape, standard sizes, keeping kitchens and bathrooms near existing pipes, and staying within permitted development so you avoid a planning application.

Sources: Planning Portal: extensions

Guide

Will your extension need planning permission?

Not always. In England, many single storey rear extensions are allowed under permitted development. The Planning Portal guidance says one can extend up to 3 metres beyond the rear wall of the original house, or 4 metres for a detached house, with a maximum height of 4 metres. Outside designated land, a larger extension of up to 6 metres, or 8 metres if detached, is possible through the prior approval process, where you notify the council and neighbours can comment.

Those rights are tighter on designated land, which includes conservation areas, National Parks and Areas of Outstanding Natural Beauty. There, side extensions and rear extensions of more than one storey need full householder planning permission, and cladding is not allowed. Permitted development applies to houses only, not flats or maisonettes, and some homes have had these rights removed. Listed buildings need listed building consent for most changes.

Wales, Scotland and Northern Ireland each have their own rules, so the limits above do not carry over. If you want certainty, you can apply for a lawful development certificate in England and Wales, which confirms your extension does not need permission.

Sources: Planning Portal: extensions, planning permission

Guide

What are building control and party wall rules, and who handles them?

Planning decides whether you can build. Building control checks how you build, covering structure, fire safety, insulation, ventilation and drainage. Almost every extension needs it. In England and Wales you can use the council or a registered building control approver. In Scotland you need a building warrant from the council before work starts. Keep the completion certificate safe, as buyers' solicitors will ask for it.

If you live in England or Wales and build on or near a shared boundary, the Party Wall etc. Act 1996 may apply. Work on a shared wall needs a party structure notice at least two months before it begins. Digging foundations within 3 metres of a neighbour's building, and deeper than their foundations, needs notice at least one month ahead. If your neighbour does not agree, surveyors are appointed to settle an award. Scotland has different arrangements.

Agree in writing who will handle each of these. Some builders do it all, while others expect you or your architect to. Either way, the legal duty to serve party wall notices sits with you as the owner, not the builder.

Sources: legislation.gov.uk: Party Wall etc. Act 1996, section 3 · legislation.gov.uk: Party Wall etc. Act 1996, section 6 · GOV.UK: party walls and building work

Guide

How do you check an extension builder is any good?

There is no licence for builders in the UK, so the checks are up to you. Visit at least one finished extension and one job in progress if you can. Talk to past clients about how the builder handled problems and delays, not just the final look. A firm that keeps a tidy, safe site and answers questions clearly is usually a firm that plans well.

Membership of the Federation of Master Builders or TrustMark means a firm has been assessed, and both offer a route if things go wrong. Check membership on their own sites. Look the company up on Companies House to see how long it has traded and whether its accounts are up to date.

Ask to see the builder's liability cover for damage and injury, plus employer's liability insurance if they have staff. Ask who will run the site day to day, which trades are in house and which are subcontracted, and whether the electricians and gas engineers are registered. Finally, make sure every builder is quoting from the same drawings and specification. Itemised quotes with clear provisional sums make comparison much easier, and a written contract protects both sides.

Sources: Federation of Master Builders · Companies House: search the register

Questions

Extension Builders: common questions

How do I check an extension builder is any good?

Visit their finished work, speak to past clients and look the company up on Companies House. Check any claimed Federation of Master Builders or TrustMark membership on those bodies' own sites. Ask for proof of insurance and a written, itemised quote based on the same drawings you gave other builders.

What is the cheapest way to build an extension?

Keeping it simple is the cheapest way. A single storey rear extension with a plain shape, standard window sizes and a kitchen near the existing drains costs less than a complex design. Staying within permitted development, where it applies, avoids a planning application, though you still need building control.

How much do builders charge per day?

No published rate exists, since every builder charges differently and prices swing a great deal across the UK. For an extension, one agreed contract sum is easier to manage than paying by the day. Ask for an itemised quote, with clear provisional sums for anything not yet chosen.

Do I need planning permission for an extension?

Not always. In England, many single storey rear extensions fall under permitted development if they meet size and height limits. Conservation areas, listed buildings, flats and homes with removed rights usually need permission. Elsewhere in the UK the limits differ, so ask your local planning department.

What is building control and who arranges it?

Building control checks that the work meets construction standards, from foundations to fire safety and insulation. In England and Wales it is done by the council or a registered building control approver. Scotland needs a building warrant first. Agree who applies and pays, and keep the completion certificate.

Should I hire an architect first or go straight to a builder?

Either route can work. An architect or designer gives you drawings that several builders can price, which makes quotes easier to compare. A design and build firm handles both but gives you fewer comparison points. Whichever you choose, settle drawings and approvals before building starts.

How long does an extension take?

Build time depends on size, design, ground conditions and weather, and approvals can add months before work starts. A good builder will give you a staged programme and explain which parts depend on others. Allow for delays waiting for materials, inspections or decisions about finishes.